
A real job, before to after
Walk in shower installation, in tile.
Curbless or low-threshold walk-ins in porcelain or marble, with a bench, niches and heavy frameless glass. Built on your slab the right way.
Get a free estimateSee what most jobs cost
5.0 from 19 reviewsSince 2020 in PlantationMarine Corps veteranOne year on our work
5.0
on Google from 19 reviews, every one word for word
2 wk
on site for a full bath, 7 to 10 working days for a tub-to-shower
1 yr
on our work, the Done Right Promise
USMC
Marine Corps veteran, Brad runs every job, fully insured
Built the way a shower should be built
Every walk-in shower we install is framed square, waterproofed with a sheet membrane, flood-tested, and finished with tile and glass I'd put in my own house.
The pretty part is the last 20 percent. The first 80 is what keeps it dry in year ten.
- The old shower, tub or stall out and hauled away
- A curbless or low-threshold entry with a linear or center drain
- A sloped mortar pan on cement board, membrane over everything, flood-tested
- Tile floor to ceiling: large-format porcelain, marble, subway or mosaic
- A built-in tile bench and recessed niches that look designed, not bolted on
- 3/8-inch frameless glass, measured after the tile
- Grab-bar blocking, slip-resistant floor tile and comfort-height fixtures when you want them
The details
What a walk-in shower installation includes:
Curbless, low-threshold, or a stall
Three ways to build a walk-in, and the slab under your house decides a lot of it.
- Curbless (zero entry): the floor runs straight into the shower, a linear drain at the back wall. The best-looking and the safest. On a slab it means recessing the floor or raising the room, so it costs the most.
- Low threshold: a 2-inch tiled curb. Easy to step over, keeps water in, works on any slab. The most common choice.
- Enclosed stall: a full glass enclosure with a door, for a bathroom where the shower sits beside a tub or a doorway. Framed and semi-frameless are options when the budget is tight.
Tile and glass, plainly
You pick the look. I'll tell you what each choice costs and how it lives.
- Large-format porcelain: fewer grout lines, easiest to clean, stands up to Florida humidity. My usual recommendation.
- Marble and natural stone: beautiful in a primary bath, and it needs sealing once a year.
- Subway and handmade tile: classic, more grout, more setting time.
- Mosaic: the floor, the niche or one feature wall. Adds character and labor.
- Glass: a fixed panel costs least; a frameless hinged door with a return costs most. Framed is still an option.
Get a free estimateor call or text (954) 242-5924
Slab houses and Florida water
Almost every house I work in sits on a concrete slab, and that's the first question for a curbless shower: do we recess the slab, build the bathroom floor up, or use a low-profile linear drain? I'll walk through the right one for your house on the first visit. Two other local facts shape the job.
- Humidity: a ducted exhaust fan sized for the room is on every quote, and the membrane runs up the walls, not just across the pan.
- Hard water: South Florida water leaves scale on glass and fixtures. A squeegee and a weekly wipe keep frameless glass clear; I'll show you on the walkthrough.
- Condos: certificate of insurance, elevator reservation and work-hour limits are built into the schedule, and the water shut-off is coordinated with the building.
The guarantee, and what to expect
One year on our work.
If a grout line, a seal or a drain gives you trouble in year one, I come back and make it right. A walk-in on its own takes 7 to 10 working days on the existing drain, up to 14 when the drain moves or the shower grows; inside a full remodel it rides the remodel's schedule.
- A written schedule before we start, and a call if anything changes it
- The pan flood-tested for 24 hours before a single tile goes on
- Glass measured after the tile and hung about a week later
- A walkthrough together before the last payment
Need the whole bathroom done?
A walk-in shower is often the heart of a bigger job.
If the vanity, floor and lighting are tired too, a full remodel usually costs less per piece than doing them one at a time. And if you have a tub nobody uses, the conversion page covers that exact swap.
Before and after.
A closed-in shower we opened up with frameless glass.
Real project: closed-in shower opened up with frameless glass.
Drag the handle to compare.


How the job runs. 7 to 10 working days on the existing drain.

Step 1
Layout and drain
The slab is recessed for a curbless entry, the linear drain body set in mortar at the back wall, the framing checked square.

Step 2
Slope and membrane
A sloped mortar bed, then a sheet membrane folded up the walls and over the drain flange. Flood test, then wait.

Step 3
Tile
Marble-look porcelain set on the sloping floor to the linear drain, every edge cut on the wet saw, clips on every joint.

Step 4
Glass and finish
The frameless panel hung, brushed nickel trim on, the bench and niches grouted, the floor continuous from bathroom to shower.
Walk-in shower prices
On its own, or as the heart of a full remodel. Written, itemized, fixed.
On its own
$6,500
to $11,000
Tiled walk-in, low threshold
Porcelain, a bench or niche, a fixed panel or door.
On its own
Top of the range
Curbless with a linear drain
As part of a remodel
$14,000
to $28,000
Full bathroom with a walk-in
The shower plus floor, vanity, lighting and paint.
As part of a remodel
$28,000
to $55,000+
Primary bath, stone and custom tile
Marble, a double vanity, layout changes.
Get your written numberRead the full guide: How Much Does a Walk-In Shower Cost?
Frameless glass is measured after the tile is in, so its line on the quote is a real measurement, not a guess.
“I hired Brad two time because of the excellent job performed . I have several leaks and did some bathroom modification and he did a excelent job and I am not easy to please.I highly recommend Brad for all you remodeling needs. He is honest and pontual and always ready to please the best part is that he clean up all the mess after finish the job. I will call him again if I need him.”
Where we work
Plantation, Davie, Sunrise, Fort Lauderdale, Pembroke Pines, Pompano Beach, Weston, Coral Springs, Boca Raton, and the rest of Broward.
On every walk-in shower quote
Included
- Demo and haul-away
- Mortar pan, membrane and flood test
- Tile floor to ceiling
- Bench and niches where there's room
- Grab-bar blocking
- Valve installed by the licensed plumber, with matching trim
- Glass
- Daily clean-up
Brought in when needed
- A licensed plumber for the valve and all drain work
- A licensed electrician for lighting or a fan
Your choices
- Curbless, low threshold or a stall
- Porcelain, stone, subway or mosaic
- Fixed panel, hinged door or framed
- Bench height, niche placement, fixture finish
Often built together
Tub-to-Shower Conversion
Swap the tub nobody uses for a tiled walk-in shower with glass and a bench. 7 to 10 working days, one crew, a fixed price.
Bathroom Remodeling
Studs-out remodels across Broward and Palm Beach County. Tile, vanity and glass by my crew, lighting by the licensed electrician I bring in. One schedule start to finish, about two weeks on site.
Accessible Bathroom Remodeling
Zero-threshold showers, grab bars in real blocking, a bench and a hand-held. For you, or for a parent you're helping. No medical claims, just a safer room.
Where we do this work.
Walk-in questions
Something else on your mind? Call or text (954) 242-5924.
How much does a walk-in shower cost in Broward County?
On its own, $6,500 to $11,000 for a tiled walk-in with glass. As part of a full bathroom remodel, $14,000 to $28,000. A primary bath in marble with a curbless entry runs $28,000 to $55,000 or more. Every quote is free and itemized.
Can you build a curbless shower in a Florida slab house?
Yes. We either recess the shower floor into the slab, build the surrounding bathroom floor up, or use a low-profile linear drain. I'll walk through the right option for your house on the first visit.
How long does walk-in shower installation take?
Most are 7 to 10 working days on the existing drain, up to 14 when the drain moves or the shower grows, including demo, the pan and flood test, tile, glass and finish. Custom tile patterns or special-order glass can add a few days, and I'll say so in the schedule.
What's the best tile for a walk-in shower in South Florida?
Large-format porcelain. Fewer grout lines, easy to clean, and it shrugs off the humidity. Marble and natural stone are beautiful in a primary bath if you're willing to seal them once a year.
Do I need frameless glass?
No. Semi-frameless and framed enclosures are still options when budget matters. Most clients pick 3/8-inch frameless because it looks clean, opens the room up, and ages well.
What are the disadvantages of a walk-in shower?
Water on the floor if the slope or the glass is wrong, which is a building problem, not a design one.
Get a free estimate.
Tell me about the shower you have now and whether you want curbless. I usually reply the same day.
- Mon to Fri
- 8 to 5
- Sat
- 9 to 4
- Sun
- closed
I usually reply the same day.
Let's design your walk-in.
Tell me about the bathroom and the slab under it. A free visit, a written fixed price.